Your Cart (0)
Purchase Below
- Designed for handling cured concrete products.
- Automatically adjusts to the load size.
- Easy to release manual latch.
- Pivoting pads align with load surface for proper contact.
- Polyurethane pads grip surface without damage.
- Complies with ASME standards.

Part Number |
Reference Number |
Rated Capacity (lbs) |
Load Width Min - Max |
Overall Width Min - Max |
HR Headroom Min - Max |
Bail |
Weight (lbs) |
|---|---|---|---|---|---|---|---|
172-1/4 |
67-2000 |
550 |
1-3/16 - 5-1/2 |
21.8 - 28.8 |
13.5 - 29.5 |
11/16 |
25 |
172-1/2 |
67-2001 |
1100 |
1-3/16 - 5-1/2 |
21.8 - 28.8 |
13.5 - 29.5 |
5/8 |
45 |
172-1 |
67-2002 |
2200 |
1-3/8 - 6-3/32 |
32.6 - 36.6 |
16.7-29.5 |
3/4 |
95 |
| Part Number | Description | Brand | Weight | Price | Quantity | Total | Total weight | |
| 172-1/4 | 67-2000 (550 Rated Cap.) Model 172 - Concrete Pressure Tong with Urethane Pads | The Caldwell Group | 25 | $1,423.00 | $1,423.00 | 25 | ||
| 172-1/2 | 67-2001 (1100 Rated Cap.) Model 172 - Concrete Pressure Tong with Urethane Pads | The Caldwell Group | 45 | $1,892.00 | $1,892.00 | 45 | ||
| 172-1 | 67-2002 (2200 Rated Cap.) Model 172 - Concrete Pressure Tong with Urethane Pads | The Caldwell Group | 95 | $2,643.00 | $2,643.00 | 95 |
Purchase Below
67-2000 (550 Rated Cap.) Model 172 - Concrete Pressure Tong with Urethane Pads
Code:
172-1/4
Brand:
The Caldwell Group
Weight:
25
lbs
Price:
$1,423.00
Total:
$1,423.00
Total weight:
25
lbs
67-2001 (1100 Rated Cap.) Model 172 - Concrete Pressure Tong with Urethane Pads
Code:
172-1/2
Brand:
The Caldwell Group
Weight:
45
lbs
Price:
$1,892.00
Total:
$1,892.00
Total weight:
45
lbs
67-2002 (2200 Rated Cap.) Model 172 - Concrete Pressure Tong with Urethane Pads
Code:
172-1
Brand:
The Caldwell Group
Weight:
95
lbs
Price:
$2,643.00
Total:
$2,643.00
Total weight:
95
lbs
Freight Policy
ORDERS OVER $899 will have free standard shipping to COMMERCIAL ADDRESS.
NOTICE!! FREIGHT TO RESIDENTIAL ADDRESSES:
Residential addresses include private homes (including businesses operating within a private residence), apartments, camps, churches, schools, day cares,
farms, public storage facilities, and other locations not generally recognized as commercial locations and shall apply to the entire premises.
Alternatives:
1. The trucking company can hold your order at the nearest terminal.
There may be additional storage fees acumulated if orders are not picked up within 2-3 days.
2. There is a $60 surcharge for appointments/call ahead deliveries.
